Avatar Systems Infrastructure Modernization

  • Home
  • Avatar Systems Infrastructure Modernization

Avatar Systems Infrastructure Modernization

CUSTOMER SUCCESS STORY

Modernizing Performance: Avatar Systems' Compute & Network Infrastructure Refresh

Viyu helped Avatar Systems modernize its aging compute and network infrastructure, creating a more reliable, high-performance environment while transitioning workloads with zero unplanned downtime.

Infrastructure Modernization | Networking & Security | Virtualization

THE KEY RESULT

Zero Unplanned Downtime

Avatar Systems successfully transitioned to a modern compute and network environment, with all workloads migrated and new network infrastructure deployed without unplanned downtime.

01 — The Challenge

Avatar Systems needed to refresh aging compute hosts and supporting infrastructure to improve performance, reliability, and compatibility with modern virtualization platforms.

The existing VMware and NSX-V environment required a complete network and firewall reconfiguration before upgrades could move forward. Critical infrastructure—including firewalls and network switches—also needed to be replaced.

With business-critical workloads depending on the environment, minimizing downtime throughout the migration was a top priority.

02 — The Viyu Solution

Viyu developed and executed a comprehensive infrastructure modernization plan designed to upgrade the environment while minimizing disruption.

Compute Infrastructure Refresh

Viyu procured and deployed three HPE ProLiant DL360 Gen11 servers, updated firmware, and installed VMware ESXi 8.0.3.

Network & Security Modernization

New FortiGate firewalls and FortiSwitch core and access switches were installed and configured, including FortiLink and VLAN setup.

Infrastructure Migration

Viyu migrated existing firewall rules from NSX-V to FortiGate and rebuilt switch configurations for the new environment.

Network Documentation

New Layer 2 and high-level network designs were documented to simplify future management and support scalability.

03 — The Results

Zero Unplanned Downtime

The migration was completed without customer-impacting outages.

Successful Workload Migration

All virtual machines were migrated to the new compute cluster using coordinated vMotion, with workloads validated before and after migration.

Clean Network Cutover

New FortiGate firewalls and FortiSwitch infrastructure were deployed and cut over during a planned after-hours window.

Built for Future Management

Complete documentation and credentials were delivered to support ongoing operations and future management of the environment.

Solutions Used

Infrastructure Modernization →
Upgrade aging infrastructure to improve performance, reliability, and scalability.

Professional Services →
Access Viyu engineering expertise for complex infrastructure planning, implementation, and migrations.

Cybersecurity →
Strengthen network security with modern firewall and security infrastructure.

“Viyu helped us modernize our compute and network infrastructure with zero disruption to the business. The migration was carefully planned and executed, and all workloads were transitioned without unplanned downtime.”

Avatar Systems